Working project of the network
The working project of networks is an important stage of preparation and approval of design and technical documentation necessary for arranging external and internal communications. On its basis, the scheme of laying engineering highways is determined, the optimal type of equipment and components is selected. Development of drawings and schemes is carried out within the framework of general construction and finishing works, in the process of reconstruction of objects and their capital repair.
Composition of the working project
Company "Gutman Construction"
- Technical task. It is drawn up together with the Customer of the project based on the initial parameters of the object, taking into account its features and purpose.
Explanatory note. The introductory part of the project documentation, which explains the main tasks and goals of the work, the principle of selection and methods of calculating the completeness of the object
- Working documentation. Detailed diagrams of the location of engineering networks according to their separate directions, plans for the placement of equipment and control systems. A detailed list (specification) of materials and technical support is attached to the drawings
- Estimated documentation. Calculations of the cost of services and materials for individual stages
On the basis of the work project, contractors allocate the scope of work and plan the schedule for their execution.
The main parts of the design
internal engineering networks
- Power supply system. Technical documentation on electrification is created taking into account the specifics of the object, established norms of energy consumption, equipment and other parameters.
- Ventilation and air conditioning system. Modern climate equipment allows you to maintain the standard level of air exchange in the premises, maintain a comfortable temperature and humidity regime. Its use increases productivity in work spaces and creates a cozy atmosphere in living rooms.
- Water supply and sewage system. It is an important part of any object, regardless of its purpose, volume and features of operation. In the design process, the optimal location and configuration of networks, equipment and additional devices is selected.
- Heating system. Its composition depends on the type of fuel, features of the construction of buildings and their energy efficiency.
- Weak networks: TV, Internet, telephone, intercoms, video surveillance, etc.
Composition of external networks
Company "Gutman Construction"
- Domestic drinking and fire-fighting water supply system
- Household, drainage and storm sewerage
- External power supply system
- Heat supply networks
- Security system
The working project is developed in several stages and consists of two parts: graphic and text.
All stages of creation of design and technical documentation undergo coordination in relevant institutions and organizations.
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!