For any residential, industrial or commercial facility, water supply is an integral part of the overall engineering system. The quality and uninterrupted supply of water depends on the comfort and convenience of operating houses and apartments, the productivity of various enterprises, the functioning and profitability of the service sector and trade.
Therefore, even at the stage of construction or repair of an object, working documentation for water supply is necessarily drawn up. This is a block of professionally designed drawings and statements, allowing you to choose the optimal layout and configuration of the water supply system, taking into account the initial conditions, to choose the most efficient equipment and technical support.
Scheme for creating working documentation
Company "Gutman Construction"
- Receipt of technical specifications. It is compiled by a team of qualified designers and the Customer of the service in order to determine the main design accents, important goals and objectives of the work.
- Collection of specifications. The working draft is created on the basis of the initial data on the actual state of engineering networks in the development area, their capacity and connection scheme.
- The conclusion of the contract. Prior to its signing with the Customer, an estimate of design work, the timing of its implementation and the conditions for the phased delivery of drawings, their coordination and approval are determined.
- Project development. A multi-stage process, as a result of which water consumption calculations are performed, the location of distribution units and equipment is determined. Based on the collected data, network layout drawings and material specifications are drawn up.
Any water supply project is approved by the relevant authorities, as a result of which the Customer or the contractor receives permission to carry out work and connect to the water supply system.
Special conditions
Company "Gutman Construction"
When designing, specialists are guided by approved sanitary-hygienic, fire-technical and urban planning standards. In the course of the work, the sources of water intake are determined, the conditions for connecting and laying the pipeline are determined, materials and components are selected for the network.
The finished working draft of the water supply system consists of a text and a graphic part. Based on them, the estimated cost of the work and the schedule for their implementation are calculated.
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!