question_answer

Need Advice?

location_on

Ukraine, Kiev, Malinskaya str., 16

en

en keyboard_arrow_down

uk

uk
more_horiz

Call you back?

Working documentation

We develop working documentation according to which it is profitable and convenient to build. Optimal terms and negotiated price. Technical support during the execution of construction and assembly works, it is possible to conclude a contract for the author's supervision.

Development of working documentation

"Gutman Construction" Company

This is one of the most important stages of project work. The speed of execution of construction and installation works and the reliability of the structure being erected, or the efficiency of the installed engineering networks and systems, directly depends on the quality of the working documentation and the degree of its detailing.

Requirements for working documentation

"Gutman Construction" Company

The requirements are regulated by the regulatory documents in force at the time of design, however, in order to achieve optimal technical and economic indicators when performing BMR, it is important to take into account the material and technical base of the contracting organization and catalogs of local materials and structures in order to avoid significant transport costs or numerous renegotiations, which in any case leads to an increase in construction time.

As experience shows, the level of design solutions at the "P" stage has significantly deteriorated in recent years, which makes the development of working documentation even more important, and also determines the need to check and optimize design solutions within the framework of current legislation and the regulatory and technical framework (adjustments do not require repeated examinations. ). However, in the case of significant shortcomings or the possibility of significant savings when the main decisions are changed, in agreement with the customer, a decision is made to re-examine the design documentation.

Also, working documentation is developed when performing one-stage design, when there is no need to pass an examination of the design documentation of subsequent capital construction objects. For example, an operating enterprise has an agreed sanitary protection zone and plans to build small sewage treatment plants or reconstruct them, in this case an examination of project documentation is not required.

The company "Gutman Construction" carries out both comprehensive development of working documentation for objects of various levels of complexity, and is ready to develop individual sections of the project on the terms of subcontracting. We design throughout the territory of Ukraine.

We design

"Gutman Construction" company

When no expert review of project documentation is required

more_horizdetails

Working documentation for power supply

more_horizdetails

Working documentation for water supply

more_horizdetails

Working documentation for ventilation

more_horizdetails

Working draft of the network

more_horizdetails

The cost of working documentation

"Gutman Construction" company

The cost is determined individually depending on the volume of work, the degree of detailing and the design terms. The base price can be determined from the base price guides. We constructively approach the issue of pricing and offer the customer optimal options.

For developers and partners, we are ready to offer special conditions for mutually beneficial cooperation.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!