When no expert review of project documentation is required

Examination of design documentation and results of engineering searches, state environmental examination of design documentation of objects, construction, reconstruction of which is expected to be carried out in the exclusive economic zone of Ukraine, in internal sea waters, on the lands of specially protected natural territories.


1. Design documentation of capital construction objects and the results of engineering searches performed for the preparation of such design documentation are subject to examination, except for the cases provided for in parts 2, 3 and 3.1 of this article. Examination of project documentation and (or) examination of the results of engineering studies are carried out in the form of state examination or non-state examination. The developer or the technical customer, at his choice, sends the project documentation and the results of engineering investigations to the state examination or non-state examination, except in cases where, in accordance with this article, regarding the design documentation of capital construction objects and the results of engineering investigations carried out for the preparation of such design documentation, a state examination is provided.

2. Expertise is not carried out regarding the project documentation of the following capital construction objects:

  1. separate residential buildings with the number of floors not exceeding three, intended for the residence of one family (objects of individual residential construction);
  2. residential buildings with the number of floors no more than three, consisting of several blocks, the number of which does not exceed ten and each of which is intended for the residence of one family, has a common wall (common walls) without openings with the neighboring block or neighboring blocks, located on a separate plot of land and has access to the territory of public use (residential buildings of blocked buildings);
  3. multi-apartment buildings with the number of floors not exceeding three, consisting of one or more block sections, the number of which does not exceed four, in each of which there are several apartments and common rooms and each of which has a separate
  4. entrance with access to the territory of the common use;
    separate objects of capital construction with the number of floors no more than two, the total area of which is no more than 1,500 square meters and which are not intended for the residence of citizens and the implementation of industrial activities, with the exception of objects that, in accordance with Article 48.1 of this Code, are particularly dangerous, technically complex or unique objects;
  5. separate objects of capital construction with the number of floors no more than two, the total area of which is no more than 1,500 square meters, which are intended for the implementation of production activities and for which the establishment of sanitary and protective zones is not required or for which within the boundaries of land plots, on which such objects are located, sanitary protection zones are established or such zones are required, with the exception of objects that, in accordance with Article 48.1 of this Code, are particularly dangerous, technically complex or unique objects.

3. Examination of project documentation shall not be conducted if construction or reconstruction does not require obtaining a construction permit, as well as in the case of such an examination of the project documentation of capital construction objects, which received a positive conclusion from a state examination or non-state examination and is reapplied (hereinafter - typical design documentation), or modifications of such design documentation that do not relate to structural and other reliability and safety characteristics of capital construction objects, or in the event that during the construction or reconstruction of linear objects, a modification of the examination of design documentation is applied, which received a positive conclusion (including individual sections). design documentation), which does not reduce the structural and other reliability and safety characteristics of linear objects and does not change their qualitative and functional characteristics, provided that the indicated modification of the design documentation does not lead to an increase in the estimate for the construction and reconstruction of linear objects. Examination of project documentation is not carried out in relation to sections of project documentation prepared for the capital repair of capital construction objects, except for project documentation prepared for the capital repair of public highways.

3.1. The examination of the results of engineering studies is not carried out if the engineering studies were carried out for the preparation of project documentation of the capital construction objects specified in part 2 of this article, as well as if obtaining a construction permit is not required for construction or reconstruction.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!