Reconstruction project

Currently, more and more often, owners of residential, commercial or industrial real estate in order to improve the efficiency of their objects, change their purpose or increase the area, perform reconstruction of buildings and engineering structures. Reconstruction works affect the structural arrangement of buildings and the technical equipment of communications, as a result of which their volume, appearance and total total load on the base (foundation) may change.

Due to the complexity and high responsibility of the measures taken, the current legislation of Ukraine has developed a clear plan and rules for dismantling, general construction and engineering works, which are fully reflected in the specially developed reconstruction project.

Basic concepts and characteristics

reconstruction

The main law that regulates urban planning activities in Ukraine, works related to architectural and technical design, legal relations on capital construction objects, is the specially developed and approved Urban Planning Code. It enumerates the list of properties of capital objects, which include any buildings, buildings and structures, including unfinished construction, the concept of reconstruction and its general characteristics.

Reconstruction is a change in the parameters of buildings and structures, their parts: number of floors, height of rooms, volume, due to reconstruction, extension or superstructure of the object, restoration or complete replacement of supporting structures, dismantling of individual elements and their replacement with similar or with improved characteristics.

In fact, reconstruction implies

  • Changing the parameters of door and window openings
  • Change of facade structures of tasks and buildings
  • Changing the design and structure of the roof, which affect the appearance of the object and its style. Conversion of the attic into a usable attic space
  • Changing the layout of foundations
  • An increase in the area of the building due to an extension or an increase in the number of floors
  • Replacement or demolition of floors, including the organization of new flights of stairs and marches in supporting structures

This section also includes the reconstruction of engineering structures, as a type of specialized work, which must take into account the specifics and directions of the object's activity, a number of environmental standards and technical production requirements. Reconstruction can be carried out at industrial and civil facilities on the basis of professionally developed and agreed design and technical documentation - reconstruction project. This type of project work can be performed only by licensed, official organizations that have SRO admission and a staff of highly qualified specialists.

Professional services

The engineering Company "Gutman Construction" offers enterprises and private individuals, commercial and state structures the entire range of preparatory and technical works for the creation of reconstruction projects of any complexity category. Development of project documentation consists of several stages:

  • Compilation of detailed specifications (individual specifications) for design
  • Examination of the actual condition of the building structures and engineering and technical communications. It is a very important stage, the reliability, durability and structural integrity of the structure depends on the correctness of its implementation. Depending on the complexity of the work, engineering studies of the construction site and laboratory studies of the structural elements of the building may be required
  • Creating a reconstruction project with the necessary technical calculations, drawing up drawings and schemes for the dismantling and construction of various building elements

  • Approval of project decisions in specialized institutions

    The cost and terms of development of the reconstruction project depend on the complexity of the works, their volume, the location of the object and its purpose.

    exposure

    MAIN DIFFICULTIES AND ERRORS

    during design preparation

    The main difficulties and mistakes
    with independent design:

    1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
    2. Lack of metering devices and objective (calculated) data on the required productivity.
    3. Lack of title deeds to the land.
    4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
    5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
    6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

     Decisions from
    Company "Gutman Construction":

    • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
    • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
    • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
    • We will analyze the existing situation and prepare the correct technical task.
    • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
    • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

    The cost of project development

    The best offer from Company "Gutman Construction"

    Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

    Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

    rocket_launch

    By starting cooperation with us You save:

    Costs
    on construction and assembly works
    Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

    Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

    Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

    ⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

    We will prepare all technical tasks

    architecturebookmark_added

    For designing

    engineeringdesign_services

    For inspection

    pending_actionsworkspace_premium

    For research

    view_in_arwork_outline

    To develop a scheme

    Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

    How do we design?

    filter_1settings_accessibility

    The customer's idea

    filter_2foundation

    Preparation of pre-project solutions and design options

    filter_3query_stats

    Development of a technical and economic feasibility study (FES)

    filter_4admin_panel_settings

    Protection of basic decisions before the customer, selection of the best option

    filter_5rebase_edit

    Preparation of detailed specifications for project development, engineering studies, survey

    filter_6auto_stories

    Project development - stage "P"

    filter_7published_with_changes

    Examination of design and estimate documentation

    filter_8offline_pin

    Development of working documentation and approval

    filter_9engineering

    Author supervision

    Everything is ready! 😀 The customer's idea has been realized!