Reconstruction of sewerage - water disposal
The sewerage and drainage reconstruction project begins with the preparation of the technical task and survey of the existing sewerage system and structures on it, determination of the objectives of the reconstruction.
If you are faced with the task of reconstruction or modernization of sewerage networks, the specialists of Company "Gutman Construction" are always ready to assist at all stages of project implementation, from route selection acts to the development of regulations for the implementation of reconstruction works without stopping existing networks. We develop projects for the reconstruction and capital repair of both internal sewerage networks and external drainage systems of objects of various degrees of complexity and volume.
Reasons for reconstruction of sewage networks
(drainage)
- Change in the required bandwidth of the network (increase in the amount of flow).
- Physical wear and tear of networks.
- Removal of networks from under the stain of new construction.
- Redevelopment of the building.
Design features
sewerage reconstruction
One of the main tasks during the planning of the reconstruction of water drainage systems and data collection is the competent calculation of loads - drawing up the water drainage balance taking into account the technological features of all consumers.
This is a painstaking process that requires high skill and experience, mistakes at this stage can lead to significant capital costs as a result.
Since sewage systems are mostly gravity networks, an important role in the design of sewerage reconstruction is played by:
- saturation of streets with accompanying networks
- building density
- the number of subscribers connected to the network being reconstructed
- terrain relief
- presence of natural and artificial obstacles (rivers, ravines, roads)
All these factors directly affect the choice of pipeline materials, the method of execution of works and the sequence of execution of sewerage reconstruction works.
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!