question_answer

Need Advice?

location_on

Ukraine, Kiev, Malinskaya str., 16

en

en keyboard_arrow_down

uk

uk
more_horiz

Call you back?

Project of capital repair or reconstruction of an engineering structure

Engineering facilities, such as transformer substations, treatment and pumping systems, may eventually require increased performance or increased safety through reconstruction and overhaul. The need for this arises due to the failure of technological equipment, a decrease in the load-bearing capacity of structures.

Overhaul and reconstruction

treatment facilities

The project in this case mainly involves the replacement of equipment. The construction of new buildings is a rather expensive undertaking. The development of the project for the reconstruction of treatment plants can be carried out in the following directions:

  1. Changing the pumping equipment to a more modern one allows to increase productivity and reduce energy consumption.
  2. Reconstruction of aeration systems allows to improve the quality of water purification.
  3. Replacing blower equipment reduces operating costs.
  4. Replacement of water purification systems with the help of chlorination with more modern ultraviolet installations. Such equipment allows reducing the number of service personnel, which does not require the constant purchase of chlorine.
  5. The implementation of production automation allows for remote control.

For equipment replacement, the "Technological solutions" section is being developed, in which installations are selected depending on the required capacity.

In case of partial collapse of capital buildings, they are restored and strengthened. In this case, the following sections are developed:

  1. explanatory note (PL);
  2. architectural and construction solutions (AS);
  3. constructive solutions (KR);
  4. decisions on engineering equipment (IOS);
  5. technological solutions (TX);
  6. a project for the organization of overhaul and reconstruction;
  7. environmental protection (EO);
  8. local and object estimates.

The design is carried out in accordance with the norms, it is important to monitor the following indicators:

  • the ventilation system must provide normal air circulation for the available volume of the room;
  • it is important to follow the rules for the evacuation of employees in case of an emergency (the width of corridors, staircases and doorways depending on the number of personnel);
  • all technological equipment corresponds to the required capacities.

Capital repair of the production affects only the premises and consists in updating the external and internal finishing, replacing slot fillings, strengthening beams and lintels.

Overhaul and reconstruction

transformer substations

The substation overhaul project may include:

  1. dismantling with the subsequent replacement of equipment elements that have failed;
  2. dismantling with replacement of damaged devices for the protection of
  3. electric current circuits;
  4. replacement of transformers;
  5. replacement of automatic switches;
  6. replacement of electrical wiring both inside and outside;
  7. replacement of elements with damaged insulation;
  8. repair or replacement of metal structures;
  9. earthing repair.

Before the design stage, it is necessary to carry out an inspection of all the equipment and structure of the TP.

The main requirements for the premises are established for reasons of safe operation.

  • the premises must correspond to the l or ll degree of fire resistance;
  • the width of the passages, the distance from the equipment to the walls is set in accordance with the "Rules for the installation of electrical installations";
  • double frames are used as window filling;
  • the ventilation system must cope with the removal of heat emitted by the equipment;
  • working lighting is provided inside the substation, but also outside the territory;
  • emergency lighting is provided in premises where it is not allowed to stop work.

The reconstruction of the transformer substations is carried out if there is a need to increase the capacity and install new equipment and affects the supporting structures of the premises. Such a project must be coordinated with state authorities.

Repair and reconstruction of engineering structures require significant costs, therefore, in order to determine the economic efficiency of reconstruction, it is necessary to carry out a feasibility study and compare it with new construction.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!