Project for the organization of work on the demolition or dismantling of a capital construction object
The elimination of existing buildings and structures is a necessary, important and costly part of almost any construction process.
Demolition or demolition work
objects of capital construction can be carried out with the purpose
- release of land for new construction;
- liquidation of objects that have lost their technological necessity or are in an old condition;
- liquidation of engineering networks and communications.
The draft of the organization of works on the demolition or dismantling of the capital construction facility is the main organizational and technological document for the liquidation of buildings and structures.
In cases where the construction of a new object is impossible without complete or partial liquidation of existing buildings and structures, the presence of a project for the organization of demolition or dismantling of the capital construction object as part of the project documentation is a mandatory condition for obtaining a construction permit.
Project for the organization of demolition or dismantling works
the object of capital construction is developed with the purpose
- determination of the most effective method of liquidation of the capital construction facility;
- ensuring the safe execution of works on the destruction or dismantling of buildings and structures;
- ensuring the preservation of existing buildings and structures located in the immediate vicinity of the object of capital construction that is being liquidated;
- ensuring the safety of the existing engineering infrastructure, including existing underground communications;
- ensuring the safety of the civilian population
Specialists of Company "Gutman Construction" are ready to advise you on any issues in the field of design, engineering and construction. Our specialists will prepare for you a technical task for the development of the PID, PIS, PPR, PPRK. A price justification will be prepared. We work on the result of both the development of project solutions and in cooperation with developers, developing solutions that are optimal for the implementation of BMR.
Company "Gutman Construction" company has all the necessary SRO permits and executes projects both under subcontracting conditions and can act as a general designer.
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!