question_answer

Need Advice?

location_on

Ukraine, Kiev, Malinskaya str., 16

en

en keyboard_arrow_down

uk

uk
more_horiz

Call you back?

Heating design

The heating system is one of the most complex engineering networks of the building: the possibility of a comfortable stay in the building in the cold season depends on how competently it is designed.

Design features of the heating system

Company "Gutman Construction"

The design engineer, who develops the heating system, must perform a number of calculations in order to determine the parameters of the engineering network. During the work, it is necessary to take into account the area of the building and the features of the climate in which the building is located, the amount of heat loss, etc. The company's specialists, who carry out complex design of the heating system, guarantee the creation of a network that provides optimal conditions for life in the winter period and has maximum energy efficiency.

Engineers pay special attention to the safety of the future system. Working with high pressure and temperature, it can be dangerous if even the slightest mistake has been made in the design. It is for this reason that the specialists of Company "Gutman Construction" strictly adhere to the norms and rules regulated by normative documents in this field in their work.

Stages of project development

Company "Gutman Construction"

  • Compilation of the technical task, study of general information about the object provided by the client.

  • Completing the necessary drafting of calculations, in particular heat engineering calculation (calculation of heat losses of the building).

  • Development of plan drawings and axonometric diagrams, diagrams of laying communications with the indication of their service areas and placement of equipment.

  • Compilation of an explanatory note, which includes a description of the main technological solutions, a list of materials and equipment used, operating conditions.
  • Preparation of details of all main components of the heating system.
  • Indication of the specification of materials and equipment used in the project.

At each stage, the employees of Company "Gutman Construction" actively interact with the Customer, achieving the optimal ratio of quality and cost of project implementation and maximum convenience of its operation.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!