Designing of chemical enterprises
The design of chemical industry enterprises is a mandatory preparatory stage before the execution of general construction works, during the planned reconstruction and modernization of facilities.
These products belong to the category of dangerous objects. Therefore, the process of creating typical or exclusive design solutions for them requires the executors to take into account many technological and profile factors, such as the industry regulatory framework, methods of working with chemical substances and reagents, fire safety and sanitary safety rules.
Composition of design and technical documentation
Company "Gutman Construction"
A typical set of documentation for the construction or reconstruction of a chemical enterprise consists of a basic project (architectural solutions at the P stage), detailed working documentation (engineering, technical and structural documentation at the RD stage). In addition, technological solutions, special and organizational sections are included in the set of design drawings, schemes and information:
- Labor and environmental protection
- Production management
- Measures to prevent and eliminate accidents and various emergency situations
- Organization of construction
- Calculations based on the maximum permissible level of discharges, emissions and waste, their storage and disposal
The terms and price of the design depend on the composition of the design and technical documentation, the profile of the enterprise and its volumes. An individual approach and careful preparation are also required for the creation of projects of terminals, transshipment complexes for chemical products and petrochemical products.
Where to order the development of design and technical documentation?
Company "Gutman Construction"
Company "Gutman Construction" provides a wide range of project services, including technical and economic feasibility studies (FES) of created projects, author supervision and support in the implementation of project solutions. The use of modern means of automation and mechanization of design processes and the latest software allows designers and technologists to significantly increase the accuracy of calculations and reduce the time of development of design solutions. For investment groups and production holdings, the company offers variant design of chemical enterprises with comparative characteristics of various structural and technological solutions.
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!