Designing enterprises of the grub industry
The enterprises of the grub industry are the state loners, as they prepare and sell grub products, they are more than happy to drink the sprouts. Prior to all such undertakings, there are also high hygiene standards, which are important for the production of high quality products.
Branches of the food industry
Company "Gutman Construction"
- Industry of soft drinks
- Wine industry
- Confectionery industry
- Canning industry
- Pasta industry
- Oil industry
- Oil industry
- Dairy industry
- Flour milling and grain industry
- Meat industry
- Brewing industry
- Fruit and vegetable industry
- Poultry industry
- Fishing industry
- Sugar industry
- Salt industry
- Alcohol industry
- Tobacco industry
- Bakery industry
Classification of food industry enterprises
All food industry enterprises are divided according to three characteristics:
- Purpose of products: enterprises manufacturing products for production purposes and enterprises manufacturing products for consumption;
- Type of raw materials: enterprises processing agricultural products and enterprises processing other types of raw materials;
- Production volumes: small, medium, large.
The design of such productions implies the division of the entire territory for development into functional zones. For the performance of this work, first the buildings for production are designed, then utility and warehouse, social and household premises, laboratories, administration buildings and other objects, the production of which directly depends on the characteristics of the production of products.
Technological design plays the main role in the design of food industry enterprises, because the profitability of the enterprise and all subsequent volume-planning, structural and engineering decisions depend on the efficiency of technological solutions.
The requirements for the design of such enterprises are standard, but despite this, this industry has its own characteristics. Due to the large amount of fat waste and the short shelf life of products, such organizations must be equipped with grease traps and a fast system for transporting raw materials and products within the enterprise. The ideal solution in this case is variant design.
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!