question_answer

Need Advice?

location_on

Ukraine, Kiev, Malinskaya str., 16

en

en keyboard_arrow_down

uk

uk
more_horiz

Call you back?

Designing dairy industry enterprises

Today, the dairy industry is one of the largest industries in our country. Numerous modern milk processing enterprises are equipped with new technological lines, thanks to which they produce a wide range of products: dairy and fermented milk products, bacterial buttermilk, oil and cheeses, ice cream, milk powder and condensed milk, substitutes for dairy products, etc.

Classification of dairy industry enterprises

Company "Gutman Construction"

  • Whole milk industry plants;
  • Oil production plants;
  • Plants for the primary processing of milk;
  • Enterprises for the creation of cheese;
  • Dairy canning enterprises;
  • Enterprises for the production of substitutes for whole and skimmed milk powder;
  • Enterprises for the creation of ice cream;
  • Enterprises for the production of therapeutic and prophylactic and baby food.

When designing, it is initially necessary to correctly zone the area of ​​the enterprise, since it will contain not only production facilities, but also auxiliary premises. Between them, free communication should be established for the transportation of raw materials, waste and finished dairy products.

Variant design is ideal for the production of dairy products, in which the right choice will be made by comparing several options. Each facility of the dairy industry enterprise is designed separately, and the construction of a production building, milk receiving units and refrigerators is also carried out separately.

When designing a dairy industry enterprise, it is important to take into account many of the nuances of this production. For example, the manufacture of dairy products implies a minimum shelf life of finished products, and also a large amount of fat waste appears during such production. Because of this, it will be necessary to add grease traps and special installations for cleaning raw materials to the project. Transport communication within the production should be as fast and convenient as possible. In addition, it is necessary to comply with sanitary requirements. By fulfilling these mandatory conditions, it is possible to establish high-quality production of dairy products.

Milk processing is carried out in the following steps

using technological solutions

  • Acceptance of raw materials;
  • Normalization;
  • Pasteurization;
  • Homogenization;
  • Vitaminization;
  • Cooling;
  • Packaging.

Such responsible and important work as design should be entrusted to real professionals in this matter. Such are the specialists of our company, they have a lot of experience in performing these tasks, so they can easily calculate the project budget (estimate for PIR). With us, drawing up a technical task for designing and carrying out other works will not cause any difficulty.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!