question_answer

Need Advice?

location_on

Ukraine, Kiev, Malinskaya str., 16

en

en keyboard_arrow_down

uk

uk
more_horiz

Call you back?

Design of storages, vegetable storages, granaries, fruit storages

The key to the success of the enterprise, puzzled by the need to store vegetables, fruits or grains, is the presence of modern ergonomic warehouses. When building food warehouses, it is important to use technical documentation that complies with design standards taking into account all requirements. This will facilitate the construction process and achieve ideal economic indicators of production.

Project Implementation Practice

storage for vegetables, fruits and grains

The design of storage facilities for agricultural products is carried out in stages.

At the first stage, a preliminary design is created with detailed technological and space-planning solutions, which is agreed with the customer and undergoes other necessary approvals and approvals.

The next design stage involves the development of design estimates for stage P, based on engineering survey materials and the examination of design documentation.

The final stage is the development of working documentation. As a result, the customer receives a full package of technical documentation, including an estimate for construction and installation work.

What is important to consider when drafting

tasks for the design organization?

The practice of our design company provides for the issuance of forms to the customer, which are the Terms of Reference for the design. This document requires detailed study and approval, since it is the basis of the future project, and therefore plays a significant role in ensuring the successful operation of the facility in the future. At the initial stage, the customer needs to decide on:

  • production volumes;
  • the purpose of the storage (type of storage products);
  • the need to change the profile of the object;
  • the need to reconstruct the warehouse;
  • additionally placed equipment;
  • planned use of equipment and mechanisms;
  • types of required engineering networks;
  • the geographical location of the object.

During the design process, some approvals from state regulatory authorities and various specifications may be required. We provide consulting assistance in the preparation of a package of documents. In our company, you will receive comprehensive support, since the main priority of our work is not to find customers, but to find partners. We are interested in the successful functioning of facilities built according to our projects and are always ready to offer new low-cost solutions if it is necessary to change the storage profile.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!