Designing of sewage treatment facilities for household wastewater

If you need a project of sewage treatment facilities for domestic and domestic wastewater or a reconstruction project - we are ready to offer optimal technological solutions using the most modern equipment (both imported and domestic production) based on a technical and economic comparison of options.

Sewage treatment facilities

Company "Gutman Construction"

Sewage treatment facilities for economic and domestic wastewater are a complex of engineering facilities aimed at removing pollutants contained in domestic wastewater.

Urban biological treatment facilities are a strategically important object in the city's infrastructure, which helps to ensure a decent level of socio-economic development and maintain a favorable ecological situation in the region.

Local treatment facilities are low-efficiency wastewater treatment facilities, as a rule, supplied complete by the manufacturer, which have the appropriate certificates. They are usually used to clean the drains of cottage villages, small rural settlements, and small industrial enterprises.

The composition of treatment facilities in each case is individual and requires a thorough engineering approach by specialists.

Determination of the productivity

of treatment facilities

Determination of the productivity of treatment facilities is performed on the basis of a detailed calculated balance of water supply and drainage of the entire city, taking into account actual loads from subscribers and planned loads based on documents on territorial planning. Our specialists have experience in the design of treatment facilities with a capacity from 10 cubic meters per day to 1,000,000 cubic meters per day.

Selection of the technological scheme of cleaning

The selection of the technological scheme of cleaning, the number of stages of cleaning, the selection of equipment parameters is carried out by professional engineers and technologists with the use of modern software simulation tools, based on the statistical data of the materials of laboratory analyzes of the flow provided by the customer

Hydraulic scheme of treatment facilities

The hydraulic scheme of the facilities is calculated on the basis of the analyzed site for the placement of treatment facilities, taking into account the relief of the area, this is one of the most important stages, since one of the main items of costs for the operation of the facilities is the pumping costs. When calculating, we try to perform the maximum possible number of technological processes in gravity mode. Our specialists can assist you in choosing a site for placing sewage treatment facilities.

As a rule, purified wastewater is discharged into the nearest reservoirs through a special release.

The quality of cleaning is regulated by the current legislation in the field of environmental protection.

The list of initial data for the design of

sewage treatment facilities

  • Town planning plan (if treatment is not planned on the territory of the enterprise)
  • Performance or consumer (subscriber) data is required for calculation
  • Data on the unevenness of the flow of sewage (subscriber mode of operation)
  • Statistical data of incoming wastewater analyzes or data on consumers (subscribers) for calculation according to regulatory requirements
  • Conditions for receiving wastewater (gravity system; pressure system, through the KNS)
  • Conditions for discharging treated wastewater (discharge into a reservoir; city sewer; onto terrain)
  • Engineering research materials (geology, geodesy, ecology, (when designing the release - hydrometeorology) (the full scope of research is required when passing the examination of the project documentation)
  • Requirements for the breakdown into stages of construction, starting complexes, based on the gradual increase in the volume of effluents discharged from the built-up area

Prices for the design of treatment facilities

Company "Gutman Construction"

The cost of project works is determined according to the basic price guides and specified at the stage of negotiations.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!