Design of greenhouse complexes
Modern greenhouse complexes - tse svydkobuduyuєmі, technically equipped with spetsіalіzovanі sporudi, scho foldable minds exploitation and high vimogami up to increased moisture, temperature drops from the sound and in the middle of life.
The more effective choice and trivality of the term of service can only be secured in advance of the design of the object, in the process of which the necessary technical characteristics of the structures and installation, the whole complex of "engineering communications systems and keys" are transferred to a high professional level of the facsimile.
Features of creating a professional project
those yoga head features
The warehouse for the project is to be laid down in the name of the minds of the greenhouses, її expansions, zastosovuvannyh designs and engineering systems. At the bud stage, the Deputy servant is obliged to give information about the cultures that grow, their vegetative period and mind the growth. Budova and equipment for greenhouses for apartments, fruits, green vegetables can be heated diametrically.
Like a frame bearing elements, there are metal supporting structures, which are covered with a special anti-corrosion coating. For covering the walls of fences in industrial greenhouses, most often vicorist is used for polyethylene plait of increased minerality, high-yield slope, or polycarbonate with a maximum level of light transparency.
Dodatkovo can be transferred to the fragments of the slopes (flats), which are automatic systems of natural ventilation and additional vents of light streams.
The area of modern spores can be 1000 sq. and more.
Obov'yazkovo is collected information about the transfer of obligations of production, especially the selection, selection and processing of products. For the engineering and technical part of the project, optimal technologies and characteristics are assigned.
Basic set of greenhouse equipment
Company "Gutman Construction"
- Climatic systems: heating, ventilation, ozonation, fogging, etc.
- Lighting and power supply
- Watering, irrigation or hydroponics systems
- Irrigation systems
- Cooling and sorting of products
- Automatic management and control system
Professional design of greenhouse complexes
carried out on the basis of upcoming documents
- Terms of Reference (TOR) for the development of the target project
- Situational and urban planning
- Certificates of state registration of the land plot
- Results of soil engineering research: geodesy, geology, environmental standards and topographic survey of the site
On the basis of technical specifications, the necessary area for the construction of the greenhouse complex is calculated immediately at the previous stage, taking into account its infrastructure and further operation of the structure.
In addition, the creation of design and technical documentation requires a number of introductory engineering and technical conditions for connecting to water supply, electricity, gas and sewage networks.
Also taken into account are data on water drainage and tasks related to the improvement of the territory, parameters of product storage and removal, waste disposal, sanitary and fire safety standards.
Demand for the development of project documentation?
those yoga head features
The whole range of services from the creation of typical and exclusive projects for everyday life and the reconstruction of greenhouse complexes of various recognition and obligatory support is provided by the Company "Gutman Construction". The design solutions, which are considered by the architects of the creative bureau, are in line with the viable environmental standards and allow for energy saving, equipped with the most modern constructive and engineering systems, including climate control, drainage systems, and hot water irrigation. The variability of design work should be laid down depending on the complexity of the project, its technological and technical features, terms of development and visibility of a set of visual documentation.
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!