Comprehensive development of the coastal area

Coastal zones are important components of the natural environment. The protection of these territories and the use of their resources is regulated at the legislative level. This allows for the safe existence of animals, plants and people living within the coastal areas.

Each coastal area is a complex object. It includes social, economic, ecological and geographical systems. Coastal areas are attractive areas. Therefore, active economic activity is often conducted on them, hotels are built, tourist infrastructure is actively developed, and residential and commercial real estate is built. In connection with this, there was a need to study the possibilities of coastal areas in order to ensure their sustainable integrated development. As a result, a concept was developed that allows effective management of coastal zones.

We design

Company "Gutman Construction"

check_circle

Designing yacht clubs

check_circle

Design of boat stations

check_circle

Designing rescue stations

check_circle

Design of small piers and moorings

check_circle

Beach infrastructure design

check_circle

Design of houses on the water

Special requirements for water protection zones

Company "Gutman Construction"

According to the norms of the Water Code of Ukraine, a special security regime is established in coastal areas. In such areas, strict requirements are imposed on the objects being erected. In particular, their construction can be carried out only after the preparation of project documentation, which is developed in compliance with special requirements. That is why builders first of all turn to professionals in the field of design, because only experts can take into account all the rules and competently draw up the "Environmental Protection" section of the project. After contacting professionals, it is mostly possible to agree the developed documentation with the controlling services without problems.

Restrictions on economic activity are established in order to prevent pollution of the aquatic environment. They operate on the coastline, the width of which usually does not exceed 500 m. In this area, the law prohibits:

  • discharge wastewater;
  • movement and parking of cars;
  • construction of gas stations;
  • organization of warehouses where combustible, poisonous, toxic and lubricating materials will be stored;
  • construction of maintenance stations;
  • construction of burial grounds;
  • car washing.

In other words, it is forbidden to build structures that could harm the water body on the site 500 m from the reservoirs. However, it is still possible to build a capital structure on the coastal territory, if measures are taken to protect the reservoir from pollution. Moreover, many facilities in 1980-1990 were built in water protection zones in gross violation of environmental norms.

Therefore, it was decided not to demolish the building, but to force the owners to take all the necessary measures aimed at protecting the environment. After that, they will be able to legalize the buildings. Thanks to the new version of the Water Code of Russia, entrepreneurs have the opportunity to do business in the water protection zone.

The developer independently chooses the type of security structure. These can be the following devices:

  • sewage systems of autonomous or centralized type;
  • systems that allow cleaning and disposal of waste water.

Technological solutions must be adopted taking into account the specifics of a specific object. Their cost directly depends on the complexity and scale of construction, and the design is often carried out after conducting hydrometeorological and geological surveys.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!