Boiler house design
Whether you need a boiler house project or a boiler house reconstruction project, we are ready to propose the best technological solutions from the most stagnant state of the art (both imported and domestic production) on the basis of a technical and economic option.
Our agreement with the design studio and the integrated approach allows us to offer competitive prices and ensure guaranteed results. We are vikonuemo the latest complex works in the collection of vacation data, it will take a while for that expertise to be put into operation by the author.
Heat supply of residential and administrative budіvel, industrial enterprises, trade objects, budіvel and installations of social recognition and other budіvelnih objects є nevidd'єmnim that the most important entry into the exploitation of these objects.
We are designing
Company "Gutman Construction"
Design of a heating boiler room
Design of a heating and production boiler room
Design of a production boiler room
Design of stand-alone boiler rooms
Designing of the attached boiler room
Design of a built-in boiler room
Design of the roof boiler room
Designing a gas boiler room
Design of a coal-fired boiler room
Design of a solid fuel boiler room
Design of an electric boiler room
Design of heat pumps
Design of a water heating boiler room
Design of a steam boiler room
Design of a steam boiler room
Design of an autonomous boiler room (automation of boiler rooms)
Design of cascade boiler houses
Boiler room design process
Company "Gutman Construction"
Boiler room design is a process that includes almost the entire set of design documentation sections. The boiler house project includes both standard sections for any object (general plan, architectural and construction solutions, design solutions, solutions for water supply and sewage, heating and ventilation, power supply and lighting), as well as a number of specialized sections that are being developed based on the necessary tasks and external factors in which the boiler house will be operated (thermomechanical solutions, solutions for fuel supply, smoke removal, solutions for chemical water treatment, heat utilization, solutions for signaling and automation of technological solutions).
Since a large amount of fuel is used in the operation of a boiler house, pressure vessels are involved, and a general emergency situation can lead to significant losses and tragic consequences, a high degree of automation is necessary for autonomous boiler houses.
For boiler plants that work with permanent service personnel, automation is implemented by local solutions, but it can also affect the main technological processes of thermal energy production.
Design of boiler house automation
Company "Gutman Construction"
The main tasks of boiler house automation are: regulation of coolant parameters within specified limits, weather-dependent regulation in the case of heating boiler houses, control of operation and shutdown of equipment and fuel supply in case of an emergency, inclusion of backup equipment, control, accounting and signaling of the main parameters of technological processes, control of gassing of premises.
Design features of boiler houses
Company "Gutman Construction"
Design features and implementation of the boiler house building are carried out on the basis of the technical task and the technical and economic justification of the decisions made. During the development of projects for the reconstruction, modernization of the boiler house or the development of projects for built-in and attached, as well as roof boiler houses, our specialists perform a comprehensive technical inspection of building structures and existing technological solutions.
Reconstruction design
modernization of boiler houses
Due to the fact that quite a large number of boiler houses are working after the set period of operation, they use old, energy-consuming, morally outdated equipment, and the construction of new boiler houses is an expensive measure, the reconstruction and modernization of boiler houses is widely used. Reconstruction and modernization make it possible to improve the condition of building structures, optimize volumetric planning solutions, introduce modern energy-efficient equipment with high efficiency, increase the degree of regulation, reduce energy costs and energy consumption, improve the technical and economic indicators of the boiler house at lower costs compared to the construction of a new one.
Stages of boiler room design
Company "Gutman Construction"
- Definition of the purposes of use of thermal energy.
- Determination of the heat supply scheme.
- Development of feasibility studies.
- Determining the location of the boiler building.
- Collection of all necessary initial data, permits, approvals.
- Development of space-planning solutions, technological schemes, equipment layout plans and other engineering sections of the project.
- Coordination of adopted engineering decisions in all interested organizations.
- Examination of project documentation.
- Delivery of project documentation to the customer.
- Development of working documentation.
Accompanying services
when designing a boiler house
- Performing a Fuel Demand Calculation (Calculation of Gas Limits)
- Design of supply gas pipelines (carrying out design work) and other engineering systems (steam supply, heat supply, gas supply - carried out both as a separate service and as part of a set of design works)
- Design of the internal gas pipeline of boiler houses
- Design of heating points, gas consumption systems
- Object inspection
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!