1. Name and address of the projected object

Warehouse at the address:


2. 2. Basis for designing

Technical task

3. Project customer


4. Executor





One-stage design.
Working documentation

5. Type of work

Design works

6. Source of funding

Customer

7. Stage design

One-stage design "Working documentation"

8. Purpose and main indicators of the object

The area of the warehouse is estimated to be up to 1,500 m2, to be specified in the course of design work. Comprehensive planning solutions, technological and constructive solutions to be agreed with the Customer.

9. Output data


  1. Technical conditions for connection from suppliers of relevant energy resources.

  2. City plan

  3. Engineering and geodetic research.


  4. Engineering and geological research.


  5. Engineering and environmental studies.

10. Composition of documentation

  1. Survey of surrounding buildings.
  2. Geotechnical justification.
  3. Project documentation:

Section 1. "Explanatory note".
Section 2. "Scheme of the planning organization of the land plot".

Section 3. "Architectural solutions".

Section 4. "Constructive and space-planning solutions", with verification calculations of load-bearing structures for the designed loads.

Section 5. "Engineering equipment, networks, engineering measures, technological solutions", including:

- Subsection "Power supply system";

- Subsection "Water supply system";

- Subsection "Water disposal system";

- Subsection "Heating, ventilation, air conditioning";

- Subsection "Communication networks" (including radio, television, telephony, video surveillance, burglar alarms, other low-voltage networks);

- Subsection "Technological solutions" (to the extent necessary for a warehouse building).

Section 6. "Construction organization project".

Section 8. "List of measures for environmental protection",

Section 9. “Fire safety measures” (including automatic fire extinguishing installations, fire alarms, warning and evacuation management in case of fire, internal fire water supply, smoke protection);

Section 12. "Technological regulations for the management of construction waste."


11. General design requirements

  1. The design should be carried out in accordance with:

    - current legislative, regulatory and technical documentation;

    - the requirements of this TOR;


  2. Agree technical solutions, location of equipment with the Customer;

    The technical solutions adopted in the project and work documentation must meet the requirements of environmental, sanitary and hygienic, fire prevention and other standards in force on the territory of Ukraine, and ensure the safe operation of the facility for the life and health of people in compliance with the measures provided for in the project.

  3. All sections must comply with current norms and rules for the operation of premises;

  4. Each section of the project should be issued in a separate volume.

12. Basic requirements for architectural and planning solutions.

The project foresees the arrangement of emergency exits (if necessary), access roads, entrance and exit gates (lifting sectional 4.5x4.5 m), platforms for loading and unloading work. Provide for finishing: screeds - poured floors, walls - sandwich panels, roofs, finishing works.

The height to the bottom of the hook of the lifting equipment is 4.5 m.

The air temperature inside the premises is +16 degrees C. Sanitary and domestic premises are not provided. Sanitary and household services for personnel are carried out in the existing ABK on the territory.

The layout and decoration of the premises must comply with the requirements of SNiP and SanPyN. The materials used must have certificates, passports of conformity and sanitary-epidemiological passports.

13. Basic requirements for a constructive solution and technological equipment.

All constructive solutions must be agreed with the Customer in advance.

The design of the constructive solution will include:

Foundations - columnar (specify according to the results of calculations);

Bearing structures - metal frame;

Enclosing structures - wall sandwich panels with insulation made of mineral wool plate with a thickness of 150 mm.

The roof is a roof sandwich panel with insulation made of mineral wool plate with a thickness of 150 mm.

In the technological equipment section, develop crane beams, load capacity, etc.

Use domestically produced equipment. Agree on the use of imported equipment with the Customer in a separate letter.

14. Requirements for engineering support.

The project provides for:

1.Heating

2.Electrical supply, electrical equipment, electrical lighting in accordance with the design capacity, PUE, PTE EP and SNiP.
3,Lightning protection, grounding;

To design the electrical supply scheme of the object; input-distribution device with electricity metering and protection devices.

1,The project provides for outdoor lighting on the facade of the building.

2,Communication networks - radio, television, telephony, other low-voltage systems.
3,Video surveillance (including security alarm).

15. Instructions on the need to coordinate project decisions

The project must be approved:

- with the Customer

16. Quantity of project documentation transferred to the Customer.

Issue design and estimate documentation in three copies, including one copy on electronic media.

17. Design terms


exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision