Access control and management systems (ACS)
At present, the access control and management system - ACS - has become widespread in many organizations. It allows you to monitor the attendance of workplaces, keep statistics. At the same time, an almost unlimited number of doors and turnstiles can be connected to such a system, keeping a record of people passing through them.
Such systems have great capabilities and certain advantages. These include clear recording of the date and time of an employee passing by, the possibility of banning certain groups from entering certain premises, entering information about all staff and non-staff situations into the database, and monitoring the movement of employees across the territory. If you combine the system with video surveillance, you will get a complete picture of what is happening on the territory. To prevent off-duty or alarming situations, the system can be combined with an alarm system, which will enable sirens and lights to be turned on. In addition, it can be combined with a fire alarm, which will allow you to unlock the doors of the emergency exits, disable the turnstiles and open the escape routes.
The access control system is usually equipped with doors, turnstiles, gates, barriers - these are blocking devices. It also has controllers - modules that are responsible for identification, control signaling and directly blocking devices. Next - scanners, machine vision devices - recognize the object, and the system software manages the controllers from the computer, allows you to receive and print reports.
Stages of development and implementation of EMS
Company "Gutman Construction"
Specialists of the company "Gutman Konstrakshin" develop the system in relation to specific conditions, calculate the cost.
If necessary, professionals will install the necessary devices (controllers, blocking devices, readers, control center), launch and test the system, issue IDs to employees.
A competently designed access control system, taking into account all current regulations, not only ensures safety at the facility, but also allows you to prevent dangerous and undesirable situations with the help of the possibility of combining with fire alarm, and in the case of combining with video surveillance - and a full record of personnel actions during working hours
MAIN DIFFICULTIES AND ERRORS
during design preparation
The main difficulties and mistakes
with independent design:
- Lack of an agreed project of the Sanitary Protection Zone (SZZ)
- Lack of metering devices and objective (calculated) data on the required productivity.
- Lack of title deeds to the land.
- Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
- The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
- Surveys, research, and design are performed by different companies, which causes delays and additional work.
Decisions from
Company "Gutman Construction":
- We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
- We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
- We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
- We will analyze the existing situation and prepare the correct technical task.
- We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
- We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.
The cost of project development
The best offer from Company "Gutman Construction"
Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.
Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.
By starting cooperation with us You save:
on construction and assembly worksBased on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.
⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.
We will prepare all technical tasks
architecturebookmark_added
For designingengineeringdesign_services
For inspectionpending_actionsworkspace_premium
For researchview_in_arwork_outline
To develop a schemeSpecialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).
How do we design?
filter_1settings_accessibility
The customer's ideafilter_2foundation
Preparation of pre-project solutions and design optionsfilter_3query_stats
Development of a technical and economic feasibility study (FES)filter_4admin_panel_settings
Protection of basic decisions before the customer, selection of the best optionfilter_5rebase_edit
Preparation of detailed specifications for project development, engineering studies, surveyfilter_6auto_stories
Project development - stage "P"filter_7published_with_changes
Examination of design and estimate documentationfilter_8offline_pin
Development of working documentation and approvalfilter_9engineering
Author supervisionEverything is ready! 😀 The customer's idea has been realized!