Design of the enterprise

The design of the enterprise begins with the study of the customer's business plan and the preparation of a complete technical task, and most importantly - a technological task, because the main thing in the enterprise is the exact choice of technological solutions.

The enterprise must solve the main task - cost-effective production of products, and this is possible only with the competent construction of technological lines and transport flows.

When designing an enterprise, there are no small things, the smallest inaccuracies in calculations, layout of equipment, architectural and construction solutions will lead to significant capital costs for the customer.

We cooperate with the leading design institutes of Ukraine and Europe, we have reliable partners on the world market, which allows us to attract leading global and domestic specialists for the development of the technological part of the project in a wide variety of industries.

We design

Company "Gutman Construction".

Design of communal catering enterprises

more_horizdetails

Designing of retail enterprises

more_horizdetails

Designing car repair enterprises

more_horizdetails

Designing of meat industry enterprises

more_horizdetails

Designing food industry enterprises

more_horizdetails

Designing dairy industry enterprises

more_horizdetails

Designing of chemical enterprises

more_horizdetails

Design of agricultural enterprises

more_horizdetails

Designing livestock enterprises

more_horizdetails

Designing pig enterprises

more_horizdetails

Designing horse breeding enterprises

more_horizdetails

Designing sheep enterprises

more_horizdetails

Design of grain processing enterprises

more_horizdetails


The main mistakes in the design of enterprises

What does this lead to

What to do with it

The selection of the technological line is provided for purchase by the designer.

The designer does not choose the optimal version of the technological scheme, but installs either the partner's equipment or the first one who gave an offer and a commission.

As part of the TOR, it is necessary to provide for the development of a technical and economic feasibility study (FEA) with consideration of 2-3 variants of the main technological and volume-planning solutions, on the basis of which the customer will be able to choose the optimal option from the main TEPs.

Requirements for engineering preparation of the territory are not taken into account in the technical task (especially relevant for large enterprises)

Upon receiving the project documentation, the customer discovers that his company does not have enough water for firefighting, electricity for the administrative building, and the sewage flows into the tank and must be taken to the landfill around the clock. (We exaggerate, but individual episodes occur)

The process of engineering preparation of the construction or reconstruction site is one of the key factors that should be considered at the feasibility stage. It is necessary to obtain preliminary technical conditions (TU), permits for the discharge of treated wastewater, etc. And on the basis of all these data, prepare a detailed design task, where the main requirements for the systems are prescribed.

The enterprise is planned to be built in start-up complexes (2-3), but we will design only the 1st.

Incorrect landing on the general plan, it is not possible to enter or arrange fire passageways, or fire breaks cannot be maintained (leads to problems with the inspecting authorities or the need to develop STU at the next stages)

It is not taken into account that the enterprise with a larger capacity will have a large sanitary and protective zone, and during the implementation of the 2nd or 3rd stage, it turns out that a garden society has been built nearby and the expansion of the enterprise is impossible.

At the first stage, the engineering training was not correctly designed and now requires significant capital expenditures

 

Design costs at the initial stage cannot be compared with additional capital costs for reconstruction, land acquisition, etc.

Having developed a complete, high-quality enterprise project, the investor will always be able to modernize and expand production with minimal costs.

verified_user

Project guarantee

Company "Gutman Construction" always undertakes warranty obligations for industrial facilities. We carry out the author's supervision and construction support and promptly resolve all issues that arise during the construction of the object.

The universal organizational structure of Company "Gutman Construction" and highly qualified engineering and technical personnel allow the implementation of industrial and production projects of varying degrees of complexity in various industries.

exposure

MAIN DIFFICULTIES AND ERRORS

during design preparation

The main difficulties and mistakes
with independent design:

  1. Lack of an agreed project of the Sanitary Protection Zone (SZZ)
  2. Lack of metering devices and objective (calculated) data on the required productivity.
  3. Lack of title deeds to the land.
  4. Inaccuracies in the preparation of the Terms of Reference: all the necessary studies were not taken into account, the documents listed above were not taken into account.
  5. The justification of the price was performed incorrectly, on the basis of commercial proposals of non-specialized organizations, without taking into account the fulfillment of the requirements of technical conditions, the need for inspection of buildings and structures, etc.
  6. Surveys, research, and design are performed by different companies, which causes delays and additional work.

 Decisions from
Company "Gutman Construction":

  • We will analyze the existing situation, prepare the Terms of Reference for the SZZ project. If necessary, we will execute the project of SZZ and agree on it.
  • We will collect all the necessary data, make calculations and submit it to the customer for consideration. If necessary, we will temporarily install metering devices.
  • We will help in the preparation of documentation, if necessary, we will include it in the TOR for design.
  • We will analyze the existing situation and prepare the correct technical task.
  • We will prepare an estimate for design and exploration works and surveys, based on basic price guides.
  • We have considerable experience and qualifications for the organization of a full range of design and search works. Company "Gutman Construction" has SRO permits for both design and exploration work. We are guaranteed to provide a positive conclusion of the examination and support during SMR.

The cost of project development

The best offer from Company "Gutman Construction"

Company "Gutman Construction" uses a time-tested method to determine the basic (initial) cost of design and estimate documentation and exploration works: drawing up an estimate for the PVR according to the basic price guides. The estimated cost of design and research works is a justified initial cost of works, which is specified in the process of clarifying the scope of works and negotiations. The cost estimate for the PVR drawn up according to the basic price guides can be the justification of the price during the tender procedure in accordance with the legislation.

Also, we facilitate the attraction of credit funds for the implementation of energy service contracts (energy efficiency) and environmental projects.

rocket_launch

By starting cooperation with us You save:

Costs
on construction and assembly works
Based on variant design and modern technologies, we select the optimal solution. 3D modeling technologies help to avoid overspending of materials and minimize the possibility of mistakes.

Costs of design and research worksAt the same time, you get a high-quality project that allows you to realize your idea on time. Thanks to the comprehensive approach, all in one hand (collection of initial data, survey and measurements, research) and the experience of our specialists, we can optimize costs and offer you a competitive price.

Time during construction and assembly worksThe solutions adopted by our engineers and architects are not only reliable and aesthetic, but also thought out from the point of view of convenience and speed of implementation (flexible solutions from the point of view of execution of works).

⚠️ . As part of the design contract, we always prescribe warranty obligations and material liability for failure of deadlines.

We will prepare all technical tasks

architecturebookmark_added

For designing

engineeringdesign_services

For inspection

pending_actionsworkspace_premium

For research

view_in_arwork_outline

To develop a scheme

Specialists of Company "Gutman Construction" are ready to help at all stages of decision-making, both at the stage of considering the project concept and when considering options for the reconstruction of existing buildings and structures. At the stage of design preparation, prepare technical tasks for design and the necessary searches. And also to prepare estimates for design and research based on basic price collections (justification of the price for the competition).

How do we design?

filter_1settings_accessibility

The customer's idea

filter_2foundation

Preparation of pre-project solutions and design options

filter_3query_stats

Development of a technical and economic feasibility study (FES)

filter_4admin_panel_settings

Protection of basic decisions before the customer, selection of the best option

filter_5rebase_edit

Preparation of detailed specifications for project development, engineering studies, survey

filter_6auto_stories

Project development - stage "P"

filter_7published_with_changes

Examination of design and estimate documentation

filter_8offline_pin

Development of working documentation and approval

filter_9engineering

Author supervision

Everything is ready! 😀 The customer's idea has been realized!